EMCO SOPs - Whole District of Seremban

Here are the latest Enhanced Movement Control Order (EMCO) SOPs for whole district of Seremban:

Effective Period:

July 9, 2021 (12.01 am) to July 22, 2021 (11.59 pm)

Involved Areas:

-Whole district of Seremban

*EMCO SOP in the entire Seremban District is applicable to EMCO areas in Taman Desaria (including Taman Desa Saga) after the EMCO SOP in this area expires.

More >

EMCO SOPs - Indahpura Industrial Area and 7 Localities within Senai Industrial Area

Here are the latest Enhanced Movement Control Order (EMCO) SOPs for the Indahpura Industrial Area and 7 Localities within Senai Industrial Area:

Effective Period:

9 July 2021 (12.01 am) until 22 July 2021 (11.59 pm)

Involved Areas:

a) Indahpura Industrial Area:

-Arena Modulasi Hostel, No. Lot 58949 Jln Pekeliling Tanjung 27/2

-I Stay Indahpura, Jalan SAC 4, I-park Indahpura Industrial Area

More >

Press Statement from the Delegation of the European Union to Malaysia

The launch of the European Union (EU) Digital COVID Certificate and travel to the EU for Malaysians have raised many questions that deserve to be addressed in full transparency. The EU Delegation to Malaysia is eager to clarify these issues, particularly in relation to vaccines produced by manufacturers that have not yet asked for, or do not intend to ask for, an authorisation by the European Medicines Agency (EMA).

Firstly, the establishment of the EU Digital COVID Certificate is to facilitate travel within the EU. It is a digital proof that a European citizen or resident has been vaccinated against Covid-19, or has received a negative test or has recovered from Covid-19. The Certificate is not a pre-requisite for travelling in the EU or a compulsory document, but simply a practical tool.

More >

[UPDATED] NATIONAL RECOVERY PLAN PHASE 2 SOPs

Here are the highlights of the latest updated SOPs for the Phase 2 of the National Recovery Plan (NRP):

Areas Involved:

Kelantan, Terengganu, Pahang, Perak, Perlis, Penang and Sabah.

* For areas under enforcement of EMCO, the EMCO SOP for the areas is in force until the expiry date of the EMCO.

Effective Period:

Starting from 5 July 2021 (starting from 12.01 AM) – Kelantan, Terengganu, Pahang, Perak and Perlis

Starting from 5 July 2021 (starting from 12.01 AM) – Penang

Starting from 10 July 2021 (starting from 12.01 AM) – Sabah (please refer to NRP – Sabah Phase 2 SOP)

More >

[UPDATED] NATIONAL RECOVERY PLAN PHASE 1 SOPs

Here are the highlights of the latest updated SOPs for the Phase 1 of the National Recovery Plan (NRP):

Areas Involved:

Kedah, Selangor, Negeri Sembilan, Melaka, Johor, Sarawak, W.P. Kuala Lumpur, W.P. Putrajaya and W.P. Labuan

*For Sarawak, please refer National Recovery Plan – Sarawak Phase 1 SOP

** For areas under enforcement of EMCO, the EMCO SOP for the areas is in force until the expiry date of the EMCO.

Effective Period:

Starting from 5 July 2021

More >

5G Network in Malaysia Survey

The 5G network is expected to be available in selected areas within Malaysia this year and is to bring more value for businesses – especially the manufacturing industry as it allows IoT devices and automation to work and communicate data at a much faster pace with lower latency issues. Additionally, the public is excited for this availability as it will increase broadband speed and reduce latency providing an overall better day-to-day user experience.

In embracing IR4.0, 5G is set to provide improvements in speed, latency, and capacity meaning better competitiveness through improvements to robotics, manufacturing controls, and warehouse automation. Which also includes increasing flexibility, lowering lead times, and cutting reconfiguration costs up.

More >
Loading...